PCB Manufacturing Process
Details of every PCB Manufacturing Process
All pcb orders need to go through the engineering department before being scheduled for production.
What the engineering department does to ensure the smooth production?
A. Gerber files Review
After customers upload the Gerber files, the engineering department will first pre-review them. The contents reviewed generally include:
Production Process 2: Warehouse and Sheet Cutting
Production Process 3: Inner Layer
1)Laser sensitive film lamination
One layer of laser sensitive film is laminated to the CCL copper surfaces by heat and pressure.
3)Development
2)LDI(Laser Direct Imaging) to exposure circuit pattern
LDI is that directly laser expose to get circuit pattern, no need film, this step of the process is performed in a clean room.
LDI exposure compared with film exposure get higher accurate and aligned imaging:
3)Development
Development is to spray the inner layers horizontally with a Sodium Carbonate solution to remove the unexposed sensitive film areas, the areas which has been laser developed will be left.
The copper under developed film are the right circuit pattern we need. Development is the preparation work for subsequent etching process, development removes the film on unwanted copper area, unwanted copper will be exposed in etching solution to get rid off, finally we get the right inner layer circuit pattern we need.
Production Process 4: Inner layers Etching
Production Process 5: Inner Layer online AOI
AOI: Automated Optical Inspection. When PCB boards going into online AOI machine, AOI will automatically scan circuit pattern to get images and compare with standard “digital images”, mark the differences between them and transmit to VRS, to confirm whether differences are false O/S points or true O/S points.
AOI Inspection can check and find inner layers images quality problems quickly, such as short, open, breaking lines. Inner layer AOI inspection can effectively prevent following production processes continue to cause unnecessary time delay and cost waste if inner layer images are found with problems, which has been judged should be scrapped and remake.
Production Process 6: Lay-up and Lamination
First step is Lay-up: Lay up copper foil, PP and base material together according to manufacturing instructions standards for lamination. In order to ensure the alignment accuracy between layers, boards should be nailed. There are 4 modes of nailing boards, eyelet, hot-melt, eyelet+hot-melt and Pin-Lam
Second step is Lamination: Under the conditions of high temperature(375 fahrenheit degrees), high pressure(275 to 400 psi) and vacuum, after thermal polymerization of polymer materials, the inner base material, copper foil and PP are laid up according to the set sequence.
Production Process 7: Mechanical Holes Drilling
We now have to drill the holes that will subsequently create electrical connections within inner and outer layers. Under the control of program files, using CNC drilling machines to drill holes on PCB which connect the electrical property between each layers.
Production Process 8: Electroless Copper Deposition
We now have to drill the holes that will subsequently create electrical connections within inner and outer layers. Under the control of program files, using CNC drilling machines to drill holes on PCB which connect the electrical
property between each layers.
Desmear+PTH+VCP 3 connecting Production Lines
Production Process 9: Online LDI Outer Layer Image
Outer Layer circuit pattern is similar with inner layer, different place is to plate a layer of Sn to protect circuit copper when outer layer etching process.
Production Process 10: Copper Plating
The second step in the plating process is copper thicken plating, this step is to thicken circuit and hole wall copper to customer requested thickness. If IPC class II, our PCB hole copper min 20um, if IPC class III, our PCB hole copper min 25um.
1)Copper Plating: Under the action of direct current, the copper loses electrons and turns into Cu2+ and dissolved in the solution. The Cu2+ acquires electrons and deposits to a copper plating layer, for thickening the circuit and hole wall copper to customer requested thickness.
2) Tin Plating: Electroplate a layer of tin on the exposed circuit surface after copper plating, to protect the required circuit copper from being etched in etching process.
Production Process 11: Outer Layer Etching
Production Process 12: Outer Layer AOI
Production Process 13: Soldermask
1)Soldermask Print
Totally automatic soldermask print, operated in 10 thousand class cleaning-room. The working panel is automatically printed on both sides with an epoxy solder mask oil about 15-25 um thick.
10 thousand class cleaning-room, Automatic soldermask Print Production Line
Automatic soldermask Print Production Line(Details)
2)Soldermask Exposure
Using a UV light and a soldermask film, the solder mask is hardened on the area where we want the solder mask to remain.
10 thousand class cleaning-room, Automatic soldermask exposure
A soldermask film
3)Soldermask Development
Soldermask Development is to remove the unexposed area soldermask oil by development solution, so that developed soldermask can be exposed out to bake in subsequent baking process.
4)Soldermask Baking
More than 80 minutes baking to make sure soldermask uniformity and adhesion, to comprehensively solve annular-ring turned red and copper exposure risk.
Soldermask Baking Tunnel Oven
Production Process 14: Silkscreen
Production Process 15: Surface Finishing(ENIG, HASL/HASL LF, OSP, Immersion Gold/Ag, Hard gold plated...)
Production Process 16: Forming
Production Process 17: E-test
Used for checking the integrity of the tracks and the through hole interconnections – checking to ensure there are no open circuits or no short circuits on the finished board. There are two test methods, flying probe for smaller volumes and fixture based for volumes.We electrically test every multilayer PCB against the original board data. Using a flying probe tester we check each net to ensure that it is complete (no open circuits) and does not short to any other net.
Production Process 18: FQC
Production Process 19: Packaging
Production Process 20: Delivery
Production Process 21: After-Sales Service
JH PCBA provide 6X24h prompt and professional PCB&PCBA service for you, any problem please feel free to contact our team, we will try to feedback you asap in 24h.
By email: sales@jh-pcba.com, or by phone 0086-755-29922552, or
Copyright © 2024 Jinghua Technology (Shenzhen) Co., Ltd. All Rights Reserved. Privacy Policy